Voice & Photo to Daily Site Report (DPR)
Field supervisors hate typing on small screens. Supersite turns 30-second WhatsApp-style voice memos and site photos into structured, audit-proof Daily Progress Reports in under 15 minutes.
85% REDUCTION IN REPORTING CYCLE TIMEDEPLOYED ACROSS 100+ ENTERPRISE SITES
Live Field Audio to Structured DPR ExecutionINPUT: UNSTRUCTURED SPEECH // OUTPUT: AUDITABLE LEDGER
Field Audio StreamSupervisor Ramesh • Tower B
Daily Voice Note (0:28s)
Captured: 16:35 IST • 4G Mobile
"Poured 42 cubic meters of M30 concrete for zone 2 slab. 18 rebar workers from Sharma on site, plus 6 carpenters. Rain halted pour at 4 PM so we stopped before corridor pour. Corridor slab casting kal subah 08:00 baje karenge, RMC supplier ko bata diya hai."
Multilingual parsing (English, Hindi, Telugu, Marathi terms)
Background construction noise filtering (>85 dB)
PROCESSED BY SUPERSITE MULTIMODAL ASR PIPELINE
COMPILED DPR #412
Greenfield Residences • Level 14 Slab Zone 2
AUTO-GENERATED: 12 MINS
CONCRETE CAST
42 m³ M30
+1.5 m³ vs target
ACTIVE TRADES
24 Workers
Sharma Contracting
WEATHER LOG
Rain: 16:00
EOT Claim Flagged
CONTRACTUAL NOTICE: MONSOON STOPPAGE LOGGED FOR EOT
Pour halted at 16:00 IST due to heavy rainfall. Timestamped weather telemetry attached to protect against liquidated damages under CPWD/FIDIC Clause 19.STATUS: PUBLISHED TO PROJECT DIRECTOR DASHBOARD
CAPABILITY 01
94%+ Field Adoption
Supervisors use WhatsApp or our lightweight offline mobile app. Zero complex training or 20-field required forms that get abandoned.
CAPABILITY 02
Automated Material Auditing
Reconciles gate-entry batching challans against poured slab volume in real-time, catching 2-3% unbilled concrete leakage.
CAPABILITY 03
Immutable Weather & Delay Records
Timestamped rain and material shortage stoppages are tied directly to contractual Extension of Time (EOT) defense clauses.